As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per eight-hour day.
Task times and precedence relationships are as follows:

Task Duration (minutes) Immediate Predecessor
a 0.2 -
b 0.4 a
c 0.2 b
d 0.4 -
e 1.2 d
f 1.2 c
g 1.0 e, f

Do each of the following:
(a) Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time. (Round your answers to 1 decimal place.)
(b) Determine the minimum number of stations needed. (Round your answer to the next whole number.)
(c) Assign tasks to workstations on the basis of the greatest number of following tasks. Use the longest processing time as a tiebreaker. If ties still exist, assume indifference in choice.
(d) Compute the percentage of idle time for the assignment in part d. Use the actual bottleneck cycle time in your calculation. (Round your answer to 2 decimal places. Omit the "%" sign in your response.)

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 01:10
Suppose someone wants to sell a piece of land for cash. the selling of a piece of land represents turning econ
Answers: 3
question
Business, 22.06.2019 10:30
What are the positive environmental trends seen today? many industries are taking measures to reduce the use( _gold,carbon dioxide,ozone_) of -depleting substances and are turning to(_scarce,renewable,non-recyclable_) energy sources though they may seem expensive. choose one of those 3 option to fill the
Answers: 3
question
Business, 22.06.2019 13:30
The purpose of safety stock is to: a. eliminate the possibility of a stockout. b. control the likelihood of a stockout due to variable demand and/or lead time. c. eliminate the likelihood of a stockout due to erroneous inventory tally. d. protect the firm from a sudden decrease in demand. e. replace failed units with good ones.
Answers: 1
question
Business, 22.06.2019 18:30
You should typically prepare at least questions for the people who will host you during a job shadow. a. 3 b. 4 c. 5 d. 2
Answers: 1
You know the right answer?
As part of a major plant renovation project, the industrial engineering department has been asked to...
Questions
question
English, 05.01.2021 22:50
question
Mathematics, 05.01.2021 22:50
question
Social Studies, 05.01.2021 22:50
question
Mathematics, 05.01.2021 22:50
question
English, 05.01.2021 22:50
question
Mathematics, 05.01.2021 22:50
Questions on the website: 13722363