WBIT 3111 IT Project Management Assignment 2: Work Breakdown Structure and Gantt Chart Campus Mobile App Project

Overview: Georgia State University has recently approved a project to implement a new campus mobile app for students. As the project manager, you have developed a preliminary scope statement with several product-related deliverables identified. To begin, you will need to complete a Needs Assessment to identify what features students want on the app and develop the requirements for the project. The projected budget is $90,000 and the project is expected to last approximately 8 months. Several product-related tasks have been identified and listed below, however, additional research will be needed to develop the WBS and prepare the project schedule.

Instructions:

β€’ Research similar projects to identify executing tasks for the project. The mobile app can either be developed inhouse or commercial software purchased and implemented (either approach is fine however the executing tasks are very different for each option).

β€’ Create a Work Breakdown Structure (WBS) for the project in tabluar form using Word. See Figures 5-3 and 5-4 in your textbook for examples. The initial WBS should be defined in terms of what needs to be done to complete the project with deliverables stated as nouns (see the additional resources for guidance in preparing the WBS). Use the Project Management Process Groups (Initiating, Planning, Executing, Monitoring & Controlling, and Closing) as the Level 2 tasks. Your final WBS structure for the project should identify a minimum of 30 total tasks decomposed to level 3 (1.1) or level 4 (1.1.1).

β€’ Once you have developed the WBS, create a project schedule (Gantt chart) in MS Project and estimate the duration for each task. Assign the task dependencies and milestones (approximately 3-4 milestones for the project). Appendix A: Guide to MS Project includes detailed instructions for creating summary tasks and entering task dependencies. The project duration from the Initiating Process to Closing should be approximately 8 months.

β€’ Upload your WBS (Word) and the Gantt Chart (MS Project) to the Dropbox. For the schedule, create a one-page view by adjusting the timescale to weeks-months, or save the file as a PDF or Snippet).

Product-Related Deliverables for the Campus Mobile App Project (initial requirements are listed – your WBS should have additional deliverables listed based on your research. All deliverables listed below are part of the Executing process group):

β€’ Survey Administration (To determine what features and functions students want access to in the app, a survey will need to be created, administered, and results analyzed. Report on survey results to project steering committee).

β€’ Research on mobile apps used by other Universities (Mobile App Research)

β€’ Commercial software/apps review

β€’ Customization options evaluation

β€’ Vendor Selection (RFP, Vendor Review, Software Selection, etc.)

β€’ Pilot Test

β€’ Implementation (communication plan, incentive plan, etc.)

β€’ Training end-users

Assessment: Criteria Weight WBS fully developed with tasks written in correct format (as deliverables), decomposed into the correct process groups, comprehensive, and realistic deliverables identified for project. 50% Project scheduled correctly using a Gantt chart (task dependencies set, timescale set (Weeks-Months), and durations set correctly and realistically); Milestones added to schedule. 50%

File Submission Upload both documents (Word file for WBS) and PDF of Gantt chart (see example below). Be sure to adjust the timescale to weeks/months to show the duration of the project. You do not need to show the duration, start and finish dates on your submission file. Check the decomposition of your project so that all deliverables are stated in nouns. Activities on a schedule below the Level 3 deliverables would include verb phrases

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 23:30
San ruiz interiors provides design services to residential and commercial clients. the residential services produce a contribution margin of $450,000 and have traceable fixed operating costs of $480,000. management is studying whether to drop the residential operation. if closed, the fixed operating costs will fall by $370,000 and san ruiz’ income will
Answers: 3
question
Business, 22.06.2019 20:20
Xinhong company is considering replacing one of its manufacturing machines. the machine has a book value of $39,000 and a remaining useful life of 5 years, at which time its salvage value will be zero. it has a current market value of $49,000. variable manufacturing costs are $33,300 per year for this machine. information on two alternative replacement machines follows. alternative a alternative b cost $ 115,000 $ 117,000 variable manufacturing costs per year 22,900 10,100 1. calculate the total change in net income if alternative a and b is adopted. 2. should xinhong keep or replace its manufacturing machine
Answers: 1
question
Business, 22.06.2019 22:40
When immigration adds to the size of the domestic labor pool, which of the following is likely to occur? a. wages decrease. b. productivity increases. c. consumption decreases. d. minimum wage increases.
Answers: 1
question
Business, 23.06.2019 00:30
Kim davis is in the 40 percent personal tax bracket. she is considering investing in hca(taxable) bonds that carry a 12 percent interest rate. what is her after- tax yield(interest rate) on the bonds?
Answers: 1
You know the right answer?
WBIT 3111 IT Project Management Assignment 2: Work Breakdown Structure and Gantt Chart Campus Mobile...
Questions
question
Mathematics, 05.05.2020 23:06
question
Biology, 05.05.2020 23:07
question
Mathematics, 05.05.2020 23:07
Questions on the website: 13722367