Floor-On, Ltd., operates a line that produces self-adhesive tiles. This line consists of single-machine stations and is almost balanced (i. e. station rates are nearly equal). A manufacturing engineer has estimated the bottleneck rate of the line to be 2,000 cases per 16-hour day and the raw process time to be 30 minutes. The line has averaged 1700 cases per day, and the cycle time has averaged 3.5 hours. What would you estimate the WIP level to be

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 16:40
Determine the hrm’s role in the performance management process and explain how to ensure the process aligns with the organization’s strategic plan.
Answers: 1
question
Business, 22.06.2019 23:50
In june, one of the processinthe assembly department started the month with 25,000 units in its beginning work in process inventory. an additional 310,000 units were transferred in from the prior department during the month to begin processing in the assembly department. there were 30,000 units completed and transferred to the next processing department during the month. how many units the assembly department started the month with 25,000 units in its beginning work in process inventory. an additional 310,000 units were transferred in from the prior department during the month to begin processing in the assembly department. there were 30,000 units completed and transferred to the next processing department during the month. how many units were in its ending work in process inventory
Answers: 2
question
Business, 23.06.2019 01:00
The monthly demand equation for an electric utility company is estimated to be p equals 60 minus left parenthesis 10 superscript negative 5 baseline right parenthesis x, where p is measured in dollars and x is measured in thousands of killowatt-hours. the utility has fixed costs of $3 comma 000 comma 000 per month and variable costs of $32 per 1000 kilowatt-hours of electricity generated, so the cost function is upper c left parenthesis x right parenthesis equals 3 times 10 superscript 6 baseline plus 32 x. (a) find the value of x and the corresponding price for 1000 kilowatt-hours that maximize the utility's profit. (b) suppose that the rising fuel costs increase the utility's variable costs from $32 to $38, so its new cost function is upper c 1 left parenthesis x right parenthesis equals 3 times 10 superscript 6 baseline plus 38 x. should the utility pass all this increase of $6 per thousand kilowatt-hours on to the consumers?
Answers: 2
question
Business, 23.06.2019 09:30
Which of the following economic behaviors causes scarcity? a limited supply and unlimited demand b limited supply and unlimited credit c limited supply and limited regulation d limited supply and limited incentives
Answers: 1
You know the right answer?
Floor-On, Ltd., operates a line that produces self-adhesive tiles. This line consists of single-mach...
Questions
Questions on the website: 13722359