Two insulation thickness alternatives have been proposed for a process steam line subject to severe weather conditions. One alternative must be selected. Estimated savings in heat loss and installation costs are given below.

A B
Thickness 5 cm 2 cm
Installed Cost $40,000 $20,000
Annual Savings $7,500 $5,000
Life 6 years 4 years

Which thickness would you recommend for a MARR = 15% per year and negligible market (salvage) values? The study period is 12 years.

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 04:50
Harwood company uses a job-order costing system that applies overhead cost to jobs on the basis of machine-hours. the company's predetermined overhead rate of $2.50 per machine-hour was based on a cost formula that estimates $240,000 of total manufacturing overhead for an estimated activity level of 96,000 machine-hours. required: 1. assume that during the year the company works only 91,000 machine-hours and incurs the following costs in the manufacturing overhead and work in process accounts: compute the amount of overhead cost that would be applied to work in process for the year and make the entry in your t-accounts. 2a. compute the amount of underapplied or overapplied overhead for the year and show the balance in your manufacturing overhead t-account. 2b. prepare a journal entry to close the company's underapplied or overapplied overhead to cost of goods sold.
Answers: 1
question
Business, 22.06.2019 05:30
In most states, a licensee must provide a(n) of any existing agency relationships to all parties
Answers: 3
question
Business, 22.06.2019 07:20
Richardson hired j.c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j.c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
question
Business, 22.06.2019 08:00
Why is it vital to maintain a designer worksheet? a. it separates the designs chosen for the season from those rejected by the company. b. it keeps a record of all designs created by the designer for a season. c. it charts out the development of an entire line through the season and beyond. d. it tracks the development of a design along with costing and production details. done
Answers: 1
You know the right answer?
Two insulation thickness alternatives have been proposed for a process steam line subject to severe...
Questions
question
Social Studies, 11.05.2021 18:30
question
Mathematics, 11.05.2021 18:30
Questions on the website: 13722361