subject
Business, 16.04.2020 01:33 mdakane3772

A firm has two plants that produce identical output. The cost functions are Upper C 1 equals 309 q minus 8 q squared plus 0.5 q cubed and Upper C 2 equals 309 q minus 14 q squared plus 1.0 q cubed. First, note that if AC 1equals309minus8qplus0.5q squared, then StartFraction dAC 1 Over dq EndFraction equals negative 8 plus 2 (0.5 )q . Similarly, if AC 2equals309minus14qplus1.0q squared, then StartFraction dAC 2 Over dq EndFraction equals negative 14 plus 2 (1.0 )q . At what output level does the average cost curve of each plant reach its minimum? The first plant reaches minimum average cost at nothing units of output. (E

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 20:00
Your assessment tool contains rich data about child progress in language and literacy but no details to explain the differences between children. you decide to: a. replace the tool with another b. analyze the data using factors such as language, ability, and participation rates c. review your anecdotal notations regarding language and literacy development d. talk with families about what they are seeing at home
Answers: 2
question
Business, 22.06.2019 05:30
Laurelton heating & cooling installs and services commercial heating and cooling systems. laurelton uses job costing to calculate the cost of its jobs. overhead is allocated to each job based on the number of direct labor hours spent on that job. at the beginning of the current year, laurelton estimated that its overhead for the coming year would be $ 61 comma 500. it also anticipated using 4 comma 100 direct labor hours for the year. in april comma laurelton started and completed the following two jobs: (click the icon to view the jobs.) laurelton paid a $ 20-per-hour wage rate to the employees who worked on these two jobs. read the requirements requirement 1. what is laurelton's predetermined overhead rate based on direct labor hours? determine the formula to calculate laurelton's predetermined overhead rate based on direct labor hours, then calculate the rate. / = predetermined overhead rate
Answers: 2
question
Business, 22.06.2019 11:30
4.     chef a says that broth should be brought to a boil. chef b says that broth should be kept at an even, gentle simmer. which chef is correct? a. neither chef is correct. b. chef a is correct. c. both chefs are correct. d. chef b is correct. student c   incorrect which is right answer
Answers: 2
question
Business, 22.06.2019 22:10
Afirm plans to begin production of a new small appliance. the manager must decide whether to purchase the motors for the appliance from a vendor at $10 each or to produce them in-house. either of two processes could be used for in-house production; process a would have an annual fixed cost of $200,000 and a variable cost of $7 per unit, and process b would have an annual fixed cost of $175,000 and a variable cost of $8 per unit. determine the range of annual volume for which each of the alternatives would be best. (round your first answer to the nearest whole number. include the indifference value itself in this answer.)
Answers: 2
You know the right answer?
A firm has two plants that produce identical output. The cost functions are Upper C 1 equals 309 q m...
Questions
question
Mathematics, 18.03.2021 03:30
question
History, 18.03.2021 03:30
question
History, 18.03.2021 03:30
question
Mathematics, 18.03.2021 03:30
Questions on the website: 13722360