An energy efficiency project has a first cost of $400,000, a life of 10 years, and no salvage value. Assume that the interest rate is 10 years, The most likely value for annual savings is $50,000. The optimistic value for annual savings is $80,000 with a probability of 0.2. The pessimistic value is $40,000 with a probability of 0.25.

1.What is the expected annual savings and the expected PW?
2.Compute the PW for the pessimistic, most likely, and optimistic estimates of the annual savings. What is the expected PW?
3.Do the answers for the expected PW match? Why or why not?

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 19:30
In business,what would be the input, conversion and output of operating a summer band camp
Answers: 1
question
Business, 22.06.2019 04:00
The simple interest in a loan of $200 at 10 percent interest per year is
Answers: 2
question
Business, 22.06.2019 10:30
When sending a claim to an insurance company for services provided by the physician, why are both icd-10 and cpt codes required to be submitted? how are these codes dependent upon each other? what would be the result of not submitting both codes on a medical claim to an insurance company?
Answers: 2
question
Business, 22.06.2019 20:00
Afirm is producing at minimum average total cost with its current plant. draw the firm's long-run average cost curve. label it. draw a point on the lrac curve at which the firm cannot lower its average total cost. draw the firm's short-run average total cost curve that is consistent with the point you have drawn. label it.g
Answers: 2
You know the right answer?
An energy efficiency project has a first cost of $400,000, a life of 10 years, and no salvage value....
Questions
question
Physics, 18.01.2021 23:40
question
Biology, 18.01.2021 23:40
question
Physics, 18.01.2021 23:40
question
Mathematics, 18.01.2021 23:40
question
Physics, 18.01.2021 23:40
Questions on the website: 13722363