Business, 21.04.2020 20:16 jadak2020

Your project is significantly over budget and behind schedule. It is critical that you determine your projected duration. To gain a better understanding of the project you analyze the sequence of deliverables, activities or tasks to find the ones with the least amount of schedule flexibility. What technique are you using

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:00
While studying for the engineering economy final exam, you and two friends find yourselves craving a fresh pizza. you can't spare the time to pick up the pizza and must have it delivered. "pick-up-sticks" offers a 1-1/4-inch-thick (including toppings), 20-inch square pizza with your choice of two toppings for $15 plus 5% sales tax and a $1.50 delivery charge (no sales tax on delivery charge). "fred's" offers the round, deep-dish sasquatch, which is 20 inches in diameter. it is 1-3/4 inches thick, includes two toppings, and costs $17.25 plus 5% sales tax and free delivery. 1. what is the problem in this situation? state it in an explicit and precise manner. 2. systematically apply the seven principles of engineering economy (pp. 3-6) to the problem you have defined in part (a). 3. assuming that your common unit of measure is dollars (i.e., cost), what is the better value for getting a pizza based on the criterion of minimizing cost per unit of volume? 4. what other criteria might be used to select which pizza to purchase?
Answers: 3
question
Business, 21.06.2019 21:50
The next dividend payment by savitz, inc., will be $2.08 per share. the dividends are anticipated to maintain a growth rate of 6 percent forever. if the stock currently sells for $42 per share, what is the required return?
Answers: 2
question
Business, 22.06.2019 13:00
Reliability and validity reliability and validity are two important considerations that must be made with any type of data collection. reliability refers to the ability to consistently produce a given result. in the context of psychological research, this would mean that any instruments or tools used to collect data do so in consistent, reproducible ways. unfortunately, being consistent in measurement does not necessarily mean that you have measured something correctly. to illustrate this concept, consider a kitchen scale that would be used to measure the weight of cereal that you eat in the morning. if the scale is not properly calibrated, it may consistently under- or overestimate the amount of cereal that’s being measured. while the scale is highly reliable in producing consistent results (e.g., the same amount of cereal poured onto the scale produces the same reading each time), those results are incorrect. this is where validity comes into play. validity refers to the extent to which a given instrument or tool accurately measures what it’s supposed to measure. while any valid measure is by necessity reliable, the reverse is not necessarily true. researchers strive to use instruments that are both highly reliable and valid.
Answers: 1
question
Business, 22.06.2019 19:40
The following cost and inventory data are taken from the accounting records of mason company for the year just completed: costs incurred: direct labor cost $ 90,000 purchases of raw materials $ 134,000 manufacturing overhead $ 205,000 advertising expense $ 45,000 sales salaries $ 101,000 depreciation, office equipment $ 225,000 beginning of the year end of the year inventories: raw materials $ 8,100 $ 10,300 work in process $ 5,900 $ 21,000 finished goods $ 77,000 $ 25,800 required: 1. prepare a schedule of cost of goods manufactured. 2. prepare the cost of goods sold section of mason company’s income statement for the year.
Answers: 3
You know the right answer?
Your project is significantly over budget and behind schedule. It is critical that you determine you...
Questions
question
Mathematics, 01.03.2021 21:50
question
Mathematics, 01.03.2021 21:50
question
Social Studies, 01.03.2021 21:50
question
Social Studies, 01.03.2021 21:50
Questions on the website: 13722362