Business, 24.04.2020 22:20 NickWinston261

Soda Company is the largest bottler in Western Europe. The company purchases Brand 1 and Brand 2 concentrate from The Soda Company, dilutes and mixes the concentrate with carbonated water, and then fills the blended beverage into cans or plastic two-liter bottles. Assume that the estimated production for Brand 1 and Brand 2 two-liter bottles at the Wakefield, UK, bottling plant are as follows for the month of May:

Brand 1 106,000 two-liter bottles
Brand 2 81,000 two-liter bottles

In addition, assume that the concentrate costs $79 per pound both Brand 1 and Brand 2 and is used at a rate of 0.1 pound per 100 liters of carbonated water in blending Brand 1 and 0.15 pound per 100 liters of carbonated water in blending Brand 2. Assume that two liters of carbonated water are used for each two-liter bottle of finished product. Assume further that two-liter bottles cost $0.08 per bottle and carbonated water costs $0.06 per liter.

Prepare a direct materials purchases budget for May, assuming inventories are ignored, because there are no changes between beginning and ending inventories for concentrate, bottles, and carbonated water.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 02:40
The following accounts are denominated in pesos as of december 31, 2015. for reporting purposes, these amounts need to be stated in u.s. dollars. for each balance, indicate the exchange rate that would be used if a translation is made under the current rate method. then, again for each account, provide the exchange rate that would be necessary if a remeasurement is being made using the temporal method. the company was started in 2000. the buildings were acquired in 2002 and the patents in 2003. (round your answers to 2 decimal places.) exchange rates for 1 peso are as follows: 2000 1 peso = $ 0.28 2002 1 = 0.26 2003 1 = 0.25 january 1, 2015 1 = 0.24 april 1, 2015 1 = 0.23 july 1, 2015 1 = 0.22 october 1, 2015 1 = 0.20 december 31, 2015 1 = 0.16 average for 2015 1 = 0.19
Answers: 3
question
Business, 22.06.2019 07:10
mark, a civil engineer, entered into a contract with david. as per the contract, mark agreed to design and build a house for david for a specified fee. mark provided david with an estimation of the total cost and the contract was mutually agreed upon. however, during construction, when mark increased the price due to a miscalculation on his part, david refused to pay the amount. this scenario is an example of a mistake.
Answers: 1
question
Business, 22.06.2019 19:10
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e.g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any “start of day” or “end of day” effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
question
Business, 22.06.2019 20:00
Miller mfg. is analyzing a proposed project. the company expects to sell 14,300 units, plus or minus 3 percent. the expected variable cost per unit is $15 and the expected fixed cost is $35,000. the fixed and variable cost estimates are considered accurate within a plus or minus 3 percent range. the depreciation expense is $32,000. the tax rate is 34 percent. the sale price is estimated at $19 a unit, give or take 3 percent. what is the net income under the worst case scenario?
Answers: 2
You know the right answer?
Soda Company is the largest bottler in Western Europe. The company purchases Brand 1 and Brand 2 con...
Questions
question
Mathematics, 15.01.2021 05:00
question
Mathematics, 15.01.2021 05:00
question
Physics, 15.01.2021 05:00
question
History, 15.01.2021 05:00
question
Mathematics, 15.01.2021 05:00
question
Mathematics, 15.01.2021 05:00
question
Computers and Technology, 15.01.2021 05:00
question
Mathematics, 15.01.2021 05:00
Questions on the website: 13722360