An asphalt paving crew is used to pave a road 8,000 feet long. The road is 48 feet wide and the paving machine can pave a 12-foot-wide strip of road during each pass. The machine paves 13 lineal feet of 12-foot-wide road per minute. Two lifts of asphalt are needed to pave the road. After completing a pass, it takes the crew 15 minutes to turn the paving machine around and get ready for the next pass. The crew consists of a foreperson, seven operators, and one laborer. Using the system efficiency of 45 minutes per hour, determine the number of labor hours required to place 1 lineal foot of road 12 feet wide.

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 20:40
Ail industries uses activity-based costing to assist management in setting prices for the company's three major product lines. the following information is available: activity cost pool estimated overhead expected use of cost driver per activity cutting $1,000,000 25,000 labor hours stitching 8,000,000 320,000 machine hours inspections 2,800,000 160,000 labor hours packing 960,000 64,000 finished goods units compute the activity-based overhead rates. (round answers to 2 decimal places, e.g. 12.25.)
Answers: 2
question
Business, 21.06.2019 21:00
The following cost data relate to the manufacturing activities of chang company during the just completed year: manufacturing overhead costs incurred: indirect materials $ 15,800 indirect labor 138,000 property taxes, factory 8,800 utilities, factory 78,000 depreciation, factory 150,600 insurance, factory 10,800 total actual manufacturing overhead costs incurred $ 402,000 other costs incurred: purchases of raw materials (both direct and indirect) $ 408,000 direct labor cost $ 68,000 inventories: raw materials, beginning $ 20,800 raw materials, ending $ 30,800 work in process, beginning $ 40,800 work in process, ending $ 70,800 the company uses a predetermined overhead rate of $20 per machine-hour to apply overhead cost to jobs. a total of 20,500 machine-hours were used during the year. required: 1. compute the amount of underapplied or overapplied overhead cost for the year. 2. prepare a schedule of cost of goods manufactured for the year.
Answers: 3
question
Business, 21.06.2019 21:20
According to the u.s. census bureau (), the median household income in the united states was $23,618 in 1985, $34,076 in 1995, $46,326 in 2005, and $57,230 in 2015. in purchasing power terms, how did family income compare in each of those four years? you will need to know that the cpi (multiplied by 100, 1982–1984 = 100) was 107.6 in 1985, 152.4 in 1995, 195.3 in 2005, and 237.0 in 2015
Answers: 3
question
Business, 22.06.2019 11:20
Stock a has a beta of 1.2 and a standard deviation of 20%. stock b has a beta of 0.8 and a standard deviation of 25%. portfolio p has $200,000 consisting of $100,000 invested in stock a and $100,000 in stock b. which of the following statements is correct? (assume that the stocks are in equilibrium.) (a) stock b has a higher required rate of return than stock a. (b) portfolio p has a standard deviation of 22.5%. (c) portfolio p has a beta equal to 1.0. (d) more information is needed to determine the portfolio's beta. (e) stock a's returns are less highly correlated with the returns on most other stocks than are b's returns.
Answers: 3
You know the right answer?
An asphalt paving crew is used to pave a road 8,000 feet long. The road is 48 feet wide and the pavi...
Questions
question
Computers and Technology, 16.09.2019 10:10
question
History, 16.09.2019 10:10
question
Spanish, 16.09.2019 10:10
question
Mathematics, 16.09.2019 10:10
question
Mathematics, 16.09.2019 10:10
Questions on the website: 13722363