An outside manufacturer has offered to produce 60,000 daks and ship them directly to andretti's customers. if andretti company accepts this offer, the facilities that it uses to produce daks would be idle; however, fixed manufacturing overhead costs would be reduced by 75%. because the outside manufacturer would pay for all shipping costs, the variable selling expenses would be only two-thirds of their present amount. what is andretti's avoidable cost per unit that it should compare to the price quoted by the outside manufacturer?

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 06:30
Select all that apply. select the ways that labor unions can increase wages. collective bargaining reducing the labor supply increasing the demand for labor creating monopolies
Answers: 1
question
Business, 22.06.2019 19:30
When it is 4: 00 a.m. in halifax, it is 1: 00 p.m. in karachi, and when it is 9: 00 a.m. in karachi, it is 5: 00 a.m. in warsaw. mary left halifax to fly to karachi, but she accidentally left her watch on warsaw time. according to mary’s watch, she left halifax at 9: 40 p.m. on monday. the local time when she arrived at karachi was 3: 00 p.m. tuesday. how long was mary’s flight? a. 9 hours, 20 minutes b. 13 hours, 20 minutes c. 14 hours, 20 minutes d. 17 hours, 20 minutes
Answers: 1
question
Business, 22.06.2019 22:00
Exercise 2-12 cost behavior; high-low method [lo2-3, lo2-4] speedy parcel service operates a fleet of delivery trucks in a large metropolitan area. a careful study by the company’s cost analyst has determined that if a truck is driven 120,000 miles during a year, the average operating cost is 11.6 cents per mile. if a truck is driven only 80,000 miles during a year, the average operating cost increases to 13.6 cents per mile. required: 1.& 2. using the high-low method, estimate the variable and fixed cost elements of the annual cost of truck operation. (round the "variable cost per mile" to 3 decimal places.)
Answers: 3
question
Business, 22.06.2019 22:50
Awork system has five stations that have process times of 5, 9, 4, 9, and 8. what is the throughput time of the system? a. 7b. 4c. 18d. 35e. 9
Answers: 2
You know the right answer?
An outside manufacturer has offered to produce 60,000 daks and ship them directly to andretti's cust...
Questions
question
Mathematics, 21.01.2022 14:00
question
Mathematics, 21.01.2022 14:00
question
Mathematics, 21.01.2022 14:00
question
Social Studies, 21.01.2022 14:00
Questions on the website: 13722362