subject
Business, 02.06.2020 15:57 Princess14321

An X-bar R chart was prepared for an operation using twenty samples with 5 pieces in each sample. X-bar-bar was found to be 33.6and R=bar was 6.2. During production a sample of 5 was taken and the pieces measured 36, 43, 37, 25, and 38. At the time this sample was taken: Select the correct

a. Both the average and range were within control limits.
b. Neither the average nor range were within control limits.
c. Only the average was outside control limits.
d. Only the range was outside control limits.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 03:00
Which of the following is not a consideration when determining your asset allocation
Answers: 3
question
Business, 22.06.2019 17:20
Arecession is defined as a period in which
Answers: 1
question
Business, 22.06.2019 20:00
Experienced problem solvers always consider both the value and units of their answer to a problem. why?
Answers: 3
question
Business, 23.06.2019 00:10
You are to receive five gold coins from your great uncle as an incentive to study hard. the coins were originally purchased in 1982. your great uncle will deliver the coins the week after finals (assuming your grades are "acceptable"). the amount your great uncle paid for the coins is a(n): indirect cost.overhead cost.opportunity cost.sunk cost.
Answers: 1
You know the right answer?
An X-bar R chart was prepared for an operation using twenty samples with 5 pieces in each sample. X-...
Questions
question
Mathematics, 03.08.2019 12:00
Questions on the website: 13722363