Your company wants to take advantage of the growing Asian market and plans to build a manufacturing facility in the southeast region to support the expansion. Management identified a set of critical factors to evaluate the prospective location, as shown in the table below; they used a rating system of 1 (least desirable) to 100 (most desirable) to evaluate each factor. Factor Weight Rating Scale (1-100)
Taiwan Thailand Singapore Vietnam
Technology 0.15 85 95 40 30
Level of Education 0.15 85 20 95 20
Economic aspects 0.20 70 65 75 55
Social aspects 0.10 85 50 85 50
Political risk 0.40 30 70 70 60
The scores for the two best locations are approximately and respectively:
a) 47 and 30
b) 50 and 47
c) 71 and 63
d) 70 and 47
e) 85 and 72

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 17:50
Identify which of the twelve basic functions listed below fit the description given.
Answers: 1
question
Business, 22.06.2019 12:50
Afirm’s production function is represented by q(m,r) = 4m 3/4r1/3, where q denotes output, m raw materials, and r robots. the firm is currently using 6 units of raw materials and 12 robots. according to the mrts, in order to maintain its output level the firm would need to give up 2 robots if it adds 9 units of raw materials. (a) true (b) false
Answers: 3
question
Business, 22.06.2019 15:00
(a) what was the opportunity cost of non-gm food for many buyers before 2008? (b) why did they prefer the alternative? (c) what was the opportunity cost in 2008? (d) why did it change?
Answers: 2
question
Business, 22.06.2019 20:30
Afirm wants to hire a project manager (pm) at a salary of $100,000. 30% of pms have high ability, and 70% of pms have low ability. high ability pms generate $120,000 in revenue and low ability pms generate $80,000 in revenue. in addition to differences in productivity, high and low ability pms have different outside offers. if a high ability pm is not hired by the firm, she can work for another company at a salary of $80,000. if the low ability pm is not hired by the firm, she can work for another company for $70,000. high ability pms are also able to get a project management professional (pmp) certification at a cost of $1,000. low ability pms are unable to get a pmp certification (they would fail the test). the firm is not able to observe a pm’s ability, but is able to observe and verify whether or not the pm has a pmp certificate.(a) draw the extensive form of the game.expert answer
Answers: 3
You know the right answer?
Your company wants to take advantage of the growing Asian market and plans to build a manufacturing...
Questions
question
Health, 07.01.2021 14:00
question
Mathematics, 07.01.2021 14:00
question
Mathematics, 07.01.2021 14:00
question
Mathematics, 07.01.2021 14:00
question
Arts, 07.01.2021 14:00
question
Chemistry, 07.01.2021 14:00
question
English, 07.01.2021 14:00
question
Physics, 07.01.2021 14:00
question
Mathematics, 07.01.2021 14:00
Questions on the website: 13722360