subject
Business, 06.01.2021 22:30 jazzzzhands21

Miranda needs to build new shelves in her pantry to store all these items. She wants to put each type of item on a separate shelf. The shelves will be able to support 25 lbs. Will the new shelves be able to support her current supply of powder goods? Use the conversion table below and a spreadsheet to help you determine the answer.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 05:00
Xie company identified the following activities, costs, and activity drivers for 2017. the company manufactures two types of go-karts: deluxe and basic. activity expected costs expected activity handling materials $ 625,000 100,000 parts inspecting product 900,000 1,500 batches processing purchase orders 105,000 700 orders paying suppliers 175,000 500 invoices insuring the factory 300,000 40,000 square feet designing packaging 75,000 2 models required: 1. compute a single plantwide overhead rate, assuming that the company assigns overhead based on 125,000 budgeted direct labor hours. 2. in january 2017, the deluxe model required 2,500 direct labor hours and the basic model required 6,000 direct labor hours. assign overhead costs to each model using the single plantwide overhead rate.
Answers: 3
question
Business, 22.06.2019 08:10
Bakery has bought 250 pounds of muffin dough. they want to make waffles or muffins in half-dozen packs out of it. half a dozen of muffins requires 1 lb of dough and a pack of waffles uses 3/4 lb of dough. it take bakers 6 minutes to make a half-dozen of waffles and 3 minutes to make a half-dozen of muffins. their profit will be $1.50 on each pack of waffles and $2.00 on each pack of muffins. how many of each should they make to maximize profit, if they have just 20 hours to do everything?
Answers: 3
question
Business, 22.06.2019 17:00
Afinancing project has an initial cash inflow of $42,000 and cash flows of βˆ’$15,600, βˆ’$22,200, and βˆ’$18,000 for years 1 to 3, respectively. the required rate of return is 13 percent. what is the internal rate of return? should the project be accepted?
Answers: 1
question
Business, 22.06.2019 17:50
Variable rate cd’s = $90 treasury bills = $150 discount loans = $20 treasury notes = $100 fixed rate cds = $160 money market deposit accts. = $140 savings deposits = $90 fed funds borrowing = $40 variable rate mortgage loans $140 demand deposits = $40 primary reserves = $50 fixed rate loans = $210 fed funds lending = $50 equity capital = $120 a. develop a balance sheet from the above data. be sure to divide your balance sheet into rate-sensitive assets and liabilities as we did in class and in the examples. b. perform a standard gap analysis and a duration analysis using the above data if you have a 1.15% decrease in interest rates and an average duration of assets of 5.4 years and an average duration of liabilities of 3.8 years. c. indicate if this bank will remain solvent after the valuation changes. if so, indicate the new level of equity capital after the valuation changes. if not, indicate the amount of the shortage in equity capital.
Answers: 3
You know the right answer?
Miranda needs to build new shelves in her pantry to store all these items. She wants to put each typ...
Questions
question
Mathematics, 03.03.2021 05:20
question
Mathematics, 03.03.2021 05:20
question
English, 03.03.2021 05:20
question
Mathematics, 03.03.2021 05:20
question
Mathematics, 03.03.2021 05:20
question
Biology, 03.03.2021 05:20
question
Mathematics, 03.03.2021 05:20
Questions on the website: 13722360