subject
Business, 29.01.2021 17:20 ToriChristine

Spud, Inc. a manufacturer of gourmet potato chips, employs activity-based costing. The budgeted data for each of the activity cost pools is provided below for the year 2020. Activity Cost Pools Estimated Overhead Estimated Use of Cost Drivers per Activity Ordering and receiving$94,72012,800 orders Food processing 492,00060,000 machine hours Packaging 1,695,450445,000 labor hours For 2020, the company had 11,800 orders and used 51,100 machine hours, and labor hours totaled 497,000.
Calculate the overhead rates for each activity. (Round answers to 2 decimal places, e. g. 12.25.)
Overhead Rates
Ordering and receiving
$Entry field with incorrect answer
per order
Food processing
$Entry field with correct answer
per machine hour
Packaging
$Entry field with correct answer
per labor hour
LINK TO TEXT
Spud, Inc. a manufacturer of gourmet potato chips,
Spud, Inc. a manufacturer of gourmet potato chips,
What is the total overhead applied?
Total overhead applied
$Entry field with incorrect answer now contains modified data
Digger Inc. sells a high-speed retrieval system for mining information. It provides the following information for the year.
Budgeted
Actual
Overhead cost $975,000 $950,000
Machine hours 50,000 45,000
Direct labor hours 100,000 92,000
Overhead is applied on the basis of direct labor hours.
Spud, Inc. a manufacturer of gourmet potato chips,
Spud, Inc. a manufacturer of gourmet potato chips,
Compute the predetermined overhead rate. (Round answer to 2 decimal places, e. g. 12.25.)
Predetermined overhead rate
$Entry field with incorrect answer now contains modified data
per direct labor hour
LINK TO TEXT
Spud, Inc. a manufacturer of gourmet potato chips,
Spud, Inc. a manufacturer of gourmet potato chips,
Determine the amount of overhead applied for the year.
Amount of overhead applied
$Entry field with incorrect answer now contains modified data
Morgana Company identifies three activities in its manufacturing process: machine setups, machining, and inspections. Estimated annual overhead cost for each activity is $150,000, $375,000, and $87,500, respectively. The cost driver for each activity and the expected annual usage are number of setups 2,500, machine hours 25,000, and number of inspections 1,750.
Compute the overhead rate for each activity.
Machine setups
$Entry field with correct answer
per setup
Machining
$Entry field with incorrect answer
per machine hour
Inspections
$Entry field with correct answer
per inspection

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 03:40
Oceanside marine company manufactures special metallic materials and decorative fittings for luxury yachts that require highly skilled labor. oceanside uses standard costs to prepare its flexible budget. for the first quarter of the year, direct materials and direct labor standards for one of their popular products were as follows: direct materials: 2 pound per unit; $ 11 per pound direct labor: 2 hours per unit; $ 19 per hour oceanside produced 2 comma 000 units during the quarter. at the end of the quarter, an examination of the direct materials records showed that the company used 7 comma 500 pounds of direct materials and actual total materials costs were $ 98 comma 100. what is the direct materials cost variance? (round any intermediate calculations to the nearest cent, and your final answer to the nearest dollar.)
Answers: 1
question
Business, 22.06.2019 07:30
When the national economy goes from bad to better, market research shows changes in the sales at various types of restaurants. projected 2011 sales at quick-service restaurants are $164.8 billion, which was 3% better than in 2010. projected 2011 sales at full-service restaurants are $184.2 billion, which was 1.2% better than in 2010. how will the dollar growth in quick-service restaurants sales compared to the dollar growth for full-service places?
Answers: 2
question
Business, 22.06.2019 10:30
How are interest rates calculated by financial institutions? financial institutions generally calculate interest as (1) interest or (.
Answers: 1
question
Business, 22.06.2019 19:10
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e.g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any “start of day” or “end of day” effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
You know the right answer?
Spud, Inc. a manufacturer of gourmet potato chips, employs activity-based costing. The budgeted data...
Questions
Questions on the website: 13722367