Geolander Tire manufactures tires for all-terrain vehicles. Geolander uses job costing and has a perpetual inventory system, On September 22, Geolander recelved an order for 120 TX tires from ATV Corporation at a price of S60 each. The job, assigned number 298, was promised for October 10. After purchasing the materials, Geolander began production on September 30 and incurred the following direct labor and direct materials costs in completing the order EEB (Click the icon to view the costs.) Geolander allccates manufacturing overhead to jobs on the basis of the relation between expected overhead costs ($540,000) and expected direct labor hours (20,000). Job 298 was completed on October 3 and shipped to ATV on October 5 Read the requirements. Requirement 1. Prepare a job cost record for Job 298. Calculate the predetermined overhead rate, then apply manufacturing overhead to the job. Begin by identifying the formula and computing the predetermined overhead rate Data Table
Requirements Date 9J30 10/3 Labor Time Record No. 1896 1904 Description 12 hours at $20 30 hours at $18 Amount S 240 S 540
1. Prepare a job cost record for Job 298
2. Calculate the total profit and the per-unit profit for Job 298. Materials Print Done Requisition Date 9/30 10/2 10/3 No. 437 60 lbs. rubber at $14 43940 meters polyester fabric at $16 640 501 Description Amount $ 840 100 meters steel cord at $12 $ 1200

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 13:30
According to the map, which continent has the most countries with a low gdp level? which two countries have the highest gdp level?
Answers: 1
question
Business, 22.06.2019 05:50
Acompany that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. prior to buying the new equipment, the company used 6 workers, who produced an average of 79 carts per hour. workers receive $16 per hour, and machine coast was $49 per hour. with the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $11 per hour while output increased by four carts per hour. a) compute the multifactor productivity (mfp) (labor plus equipment) under the prior to buying the new equipment. the mfp (carts/$) = (round to 4 decimal places). b) compute the productivity changes between the prior to and after buying the new equipment. the productivity growth = % (round to 2 decimal places)
Answers: 3
question
Business, 22.06.2019 12:00
Select the correct answer. martha is a healer, a healthcare provider, and an experienced nurse. she wants to share her daily experiences, as well as her 12 years of work knowledge, with people who may be interested in health and healing. which mode of internet communication can martha use? a. wiki b. email c. message board d. chat e. blog
Answers: 2
question
Business, 22.06.2019 17:30
Palmer frosted flakes company offers its customers a pottery cereal bowl if they send in 3 boxtops from palmer frosted flakes boxes and $1. the company estimates that 60% of the boxtops will be redeemed. in 2012, the company sold 675,000 boxes of frosted flakes and customers redeemed 330,000 boxtops receiving 110,000 bowls. if the bowls cost palmer company $3 each, how much liability for outstanding premiums should be recorded at the end of 2012?
Answers: 2
You know the right answer?
Geolander Tire manufactures tires for all-terrain vehicles. Geolander uses job costing and has a per...
Questions
question
History, 21.03.2020 20:31
Questions on the website: 13722361