subject
Business, 19.03.2021 01:00 ashleyaparicio7116

Injection molding is planned to be used to produce a syringe cap product with the expected annual production rate of 100,000,000/year. Assume that this facility runs 50 week a year and 24-hour/day x 7 days operation schedule. The current mold set used for the product has 20 cavities with projected surface area of 3 cm 2 for each cavity. The cycle time for a single injection is about 10 seconds, and the operation requires 200 MPa pressure for injection. (1) what is the minimum metric tonnage needed for the clamping mechanism

ansver
Answers: 2

Another question on Business

question
Business, 23.06.2019 00:30
Kim davis is in the 40 percent personal tax bracket. she is considering investing in hca(taxable) bonds that carry a 12 percent interest rate. what is her after- tax yield(interest rate) on the bonds?
Answers: 1
question
Business, 23.06.2019 15:00
Ultravision inc. anticipates sales of $280,000 from january through april. materials will represent 50 percent of sales, and because of level production, material purchases will be equal for each month during the four months of january, february, march, and april. materials are paid for one month after the month purchased. materials purchased in december of last year were $24,000 (half of $48,000 in sales). labor costs for each of the four months are slightly different due to a provision in the labor contract in which bonuses are paid in february and april. the labor figures are: january $14,000 february 17,000 march 14,000 april 19,000 fixed overhead is $10,000 per month. prepare a schedule of cash payments for january through april. (assume the $280,000 of sales occur equally over the four months of january through april, i.e. monthly sales = $280,000 / 4.)
Answers: 3
question
Business, 23.06.2019 17:30
Globalman tech purchased raw material from newbiztr co. when the sales team at newbiztr co checked the system, there was no payment detail in the system, though the order-delivery details were present. also, it seemed that someone had tampered with the details of the previous order. which important data-management features were compromised? the of data was compromised because there were corresponding payment details. the of data was compromised as someone had tampered with the details of the previous order.
Answers: 2
question
Business, 24.06.2019 03:30
In "drum, buffer, rope," what provides the schedule, i.e. the pace of production? a. rope b. buffer c. drum d. all three of the above in combination e. none of the above
Answers: 1
You know the right answer?
Injection molding is planned to be used to produce a syringe cap product with the expected annual pr...
Questions
question
English, 20.04.2020 16:22
question
Mathematics, 20.04.2020 16:22
question
Social Studies, 20.04.2020 16:22
Questions on the website: 13722360