subject
Business, 05.04.2021 17:10 mbede002

A ISO 9001 é a base do sistema de gestão da qualidade, consistindo em um conjunto de normas de padronização adotadas em nível global que incide sobre todos os elementos da gestão da qualidade que uma empresa deve ter para ter um sistema eficaz, permitindo a gestão e a melhorando a qualidade de seus produtos ou serviços. Podem ser considerados como benefícios da padronização:
I. Permite utilizar adequadamente os recursos disponíveis.
II. Beneficia a operacionalização do processo.
III. Aumento da produtividade.
IV. Desenvolve a qualidade dos produtos.
V. Obtém o controle do processo.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 04:30
The lee family is looking to buy a house in one of two suburban areas just outside of a major city, and air quality is a top priority for them. overall air quality is calculated by taking measures in 100 locations within each suburb and then calculating a measure of central tendency. in one suburb, there is a major bus station that creates very poor air quality at its location but has no impact in the surrounding parts of the suburb. in this situation, which measure of overall suburb air quality would be most useful?
Answers: 3
question
Business, 22.06.2019 07:00
For the past six years, the price of slippery rock stock has been increasing at a rate of 8.21 percent a year. currently, the stock is priced at $43.40 a share and has a required return of 11.65 percent. what is the dividend yield? 3.20 percent 2.75 percent 3.69 percent
Answers: 3
question
Business, 22.06.2019 14:20
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
question
Business, 22.06.2019 19:40
Your father's employer was just acquired, and he was given a severance payment of $375,000, which he invested at a 7.5% annual rate. he now plans to retire, and he wants to withdraw $35,000 at the end of each year, starting at the end of this year. how many years will it take to exhaust his funds, i.e., run the account down to zero? a. 22.50 b. 23.63 c. 24.81 d. 26.05 e. 27.35
Answers: 2
You know the right answer?
A ISO 9001 é a base do sistema de gestão da qualidade, consistindo em um conjunto de normas de padro...
Questions
question
English, 13.06.2020 21:57
question
Mathematics, 13.06.2020 21:57
question
Mathematics, 13.06.2020 21:57
Questions on the website: 13722363