subject
Business, 01.05.2021 15:50 mpete1234567890

A firm needs to fully satisfy the demand, which is fixed to 900 units and generates unit revenue of $10. However, its production is subject to the random yield. That is, only a random percentage of production quantity is qualified for demand satisfaction. For each unit that the firm plans to produce, $5 is incurred as the production cost regardless if it can be used or not at the end. If the qualified final output from the production is less than the demand, the firm has to outsource from a more expensive source to cover the gap. The corresponding cost is $9.5 per unit. If the qualified output is more than the demand, the firm can salvage the leftover at the unit price of $4.
The firm has the historical data on the production yield rate, which can be used to estimate the distribution of the random yield rate.
Please answer the following questions and show formulas in excel for the solutions:
1. Use the Histogram to estimate the probability distribution of random yield rate. Use the estimated production yield rate probability distribution, set up the model and determine the production quantity based on EMV criterion.
2. Use the estimated production yield rate probability distribution to set up the simulation model and determine the production quantity based on EMV criterion.
3. Assume the production yield rate satisfying the Normal Distribution. Use the Descriptive Statistics to estimate its Normal Distribution. Use the estimated Normal distribution to set up the simulation model and determine the production quantity based on EMV criterion.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 14:20
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
question
Business, 22.06.2019 16:00
In a perfectly competitive market, the long-run market supply curve tends to be horizontal or nearly so. what is another way to state this fact? (a) market supply is much more elastic in the long run than the short run. (b) in the long run, average total cost is minimized. (c) in the long run, price equals marginal cost. (d) market supply is much less elastic in the long run than the short run.
Answers: 1
question
Business, 22.06.2019 18:10
Why would an investor invest in your stocks
Answers: 1
question
Business, 22.06.2019 22:00
Which of the following is a function performed by market prices? a. market prices communicate information to buyers and sellers. b. market prices coordinate the decisions of buyers and sellers. c. market prices motivate entrepreneurs to produce those products that are currently most desired relative to their costs of production. d. all of the above are functions performed by market prices.
Answers: 2
You know the right answer?
A firm needs to fully satisfy the demand, which is fixed to 900 units and generates unit revenue of...
Questions
question
Mathematics, 30.08.2019 18:30
question
Mathematics, 30.08.2019 18:30
Questions on the website: 13722367