An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $12,000 per year. In addition, an extra $17.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 55 days per year

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 21:00
Case in point 2.4 attaway airlines, part two back at attaway airlines, the morning meeting ended with no agreement between dan esposito and molly kinnon. in fact, a new issue arose. molly now says that the new accounting system is entitled to the highest priority because the federal government soon will require the reporting of certain types of company-paid health insurance premiums. because the current system will not handle this report, she insists that the entire accounting system is a nondiscretionary project. as you might expect, dan is upset. can part of a project be nondiscretionary? what issues need to be discussed? the committee meets again tomorrow, and the members will look to you, as the it director, for guidance.
Answers: 1
question
Business, 22.06.2019 05:30
In most states, a licensee must provide a(n) of any existing agency relationships to all parties
Answers: 3
question
Business, 22.06.2019 07:40
Shelby company produces three products: product x, product y, and product z. data concerning the three products follow (per unit): product x product y product z selling price $ 85 $ 65 $ 75 variable expenses: direct materials 25.50 19.50 5.25 labor and overhead 25.50 29.25 47.25 total variable expenses 51.00 48.75 52.50 contribution margin $ 34.00 $ 16.25 $ 22.50 contribution margin ratio 40 % 25 % 30 % demand for the company’s products is very strong, with far more orders each month than the company can produce with the available raw materials. the same material is used in each product. the material costs $8 per pound, with a maximum of 4,400 pounds available each month. required: a. compute contribution margin per pound of materials used. (round your intermediate calculations and final answers to 2 decimal places.) contribution margin per pound product x $ product y $ product z $ b. which orders would you advise the company to accept first, those for product x, for product y, or for product z? which orders second? third? product x product y product z
Answers: 3
question
Business, 22.06.2019 11:00
When using various forms of promotion to carry the promotion message, it is important that the recipients of the message interpret it in the same way. creating a unified promotional message, where potential customers perceive the same message, whether it is in a tv commercial, or on a billboard, or in a blog, is called
Answers: 2
You know the right answer?
An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan...
Questions
Questions on the website: 13722359