subject
Business, 25.06.2021 01:00 ladnerhailey16

A pre-determined overhead rate includes:. a. estimated total manufacturing overhead cost in the numerator.
b. only the fixed portion of the estimated manufacturing overhead cost in the numerator.
c. only the variable portion of the estimated manufacturing overhead cost in the numerator.
d. estimated total manufacturing overhead cost in the denominator.

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 23:30
San ruiz interiors provides design services to residential and commercial clients. the residential services produce a contribution margin of $450,000 and have traceable fixed operating costs of $480,000. management is studying whether to drop the residential operation. if closed, the fixed operating costs will fall by $370,000 and san ruiz’ income will
Answers: 3
question
Business, 22.06.2019 12:00
Areal estate agent is considering changing her cell phone plan. there are three plans to choose from, all of which involve a monthly service charge of $20. plan a has a cost of $.42 a minute for daytime calls and $.17 a minute for evening calls. plan b has a charge of $.52 a minute for daytime calls and $.15 a minute for evening calls. plan c has a flat rate of $80 with 275 minutes of calls allowed per month and a charge of $.38 per minute beyond that, day or evening.a. determine the total charge under each plan for this case: 150 minutes of day calls and 70 minutes of evening calls in a month. (do not round intermediate calculations. round your answer to 2 decimal places. omit the "$" sign in your response.)c. if the agent will use the service for daytime calls, over what range of call minutes will each plan be optimal? (round each answer to the nearest whole number.include the indifference point itself in each answer.)d. suppose that the agent expects both daytime and evening calls. at what point (i.e., percentage of total call minutes used for daytime calls) would she be indifferent between plans a and b?
Answers: 1
question
Business, 22.06.2019 19:10
Do it! review 16-3 the assembly department for right pens has the following production data for the current month. beginning work in process units transferred out ending work in process 0 22,500 16,000 materials are entered at the beginning of the process. the ending work in process units are 70% complete as to conversion costs. compute the equivalent units of production for (a) materials and (b) conversion costs. materials conversion costs the equivalent units of production
Answers: 2
question
Business, 23.06.2019 03:00
3. saving two consumers, larry and jeff, have utility functions defined over the two periods of their lives: middle age (period zero) and retirement (period 1). they have the same income in period 0 of m dollars and they will not earn income in period 1. the interest rate they face is r. larry’s and jeff’s utility functions are as follow. = 0.5 + 0.5 and = 0.5 + 0.5 for each person is between zero and one and represents each consumer’s temporal discount econ 340: intermediate microeconomics. ben van kammen: purdue university. rate. a. write the budget constraint that applies to both jeff and larry in terms of consumption in each period and ), interest rate, and m. b. what is larry’s and what is jeff’s marginal rate of intertemporal substitution? c. what is the slope of the budget constraint? d. write each consumer’s condition for lifetime utility maximization. e. re-arrange the conditions from part (d) to solve for the ratio, . f. if > which consumer will save more of his middle age income? g. if > 1 1+ , in which period will larry consume more: = 0 or = 1?
Answers: 2
You know the right answer?
A pre-determined overhead rate includes:. a. estimated total manufacturing overhead cost in the num...
Questions
Questions on the website: 13722360