Floor-On, Ltd., operates a line that produces self-adhesive tiles. This line consists of single-machine stations and is almost balanced (i. e., station rates are nearly equal). A manufacturing engineer has estimated the bottleneck rate of the line to be 2,000 cases per 16-hour day and the raw process time to be 30 minutes. The line has averaged 1,700 cases per day, and cycle time has averaged 3.5 hours. a) What would you estimate average WIP level to be?
b) How does this performance compare to the practical worst case?
c) What would happen to the throughput of the line if we increased capacity at a non-bottleneck station and held WIP constant at its current level?
d) What would happen to the throughput of the line if we replaced a single-machine station with four machines whose capacity equaled that of the single machine and held the WIP constant at its current level?
e) What would happen to the throughput of the line if we began moving cases of tiles between stations in large batches instead of one at a time?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 00:30
Refers to the way we conduct ourselves
Answers: 2
question
Business, 22.06.2019 12:30
Amap from a trade development commission or chamber of commerce can be more useful than google maps for identifying
Answers: 1
question
Business, 22.06.2019 18:00
Abbington company has a manufacturing facility in brooklyn that manufactures robotic equipment for the auto industry. for year 1, abbingtonabbington collected the following information from its main production line: actual quantity purchased-200 units, actual quantity used-110 units, units standard quantity-100 units, actual price paid-$8 per unit, standard price-$10 per unit. atlantic isolates price variances at the time of purchase. what is the materials price variance for year 1? 1. $400 favorable. 2. $400 unfavorable. 3. $220 favorable. 4. $220 unfavorable.
Answers: 2
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
Floor-On, Ltd., operates a line that produces self-adhesive tiles. This line consists of single-mach...
Questions
question
Mathematics, 11.03.2020 02:53
question
Mathematics, 11.03.2020 02:53
question
Computers and Technology, 11.03.2020 02:53
question
Mathematics, 11.03.2020 02:53
Questions on the website: 13722363