Business, 13.10.2021 22:30 tatejordan02

The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 45, 40, and 20 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 110 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are, in total, six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 40 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 130 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if the need arises, it can add a second shift of eight hours for the assembly lines. The cost of assembly labor is 25 cents per part for each assembly line; the cost of drilling labor is 20 cents per part. For drilling, the cost of electricity is 1 cent per part. The total overhead cost has been calculated as $1,100 per week. The depreciation cost for equipment has been calculated as $20 per week. a. Determine the process capacity (number of components produced per week) of the entire process.

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 23:00
How supply and demand work together to reach the equilibrium price in the marketplace? give at least a paragraph. you!
Answers: 3
question
Business, 22.06.2019 05:00
Xie company identified the following activities, costs, and activity drivers for 2017. the company manufactures two types of go-karts: deluxe and basic. activity expected costs expected activity handling materials $ 625,000 100,000 parts inspecting product 900,000 1,500 batches processing purchase orders 105,000 700 orders paying suppliers 175,000 500 invoices insuring the factory 300,000 40,000 square feet designing packaging 75,000 2 models required: 1. compute a single plantwide overhead rate, assuming that the company assigns overhead based on 125,000 budgeted direct labor hours. 2. in january 2017, the deluxe model required 2,500 direct labor hours and the basic model required 6,000 direct labor hours. assign overhead costs to each model using the single plantwide overhead rate.
Answers: 3
question
Business, 22.06.2019 14:20
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
question
Business, 22.06.2019 20:10
Given the following information, calculate the savings ratio: liabilities = $25,000 liquid assets = $5,000 monthly credit payments = $800 monthly savings = $760 net worth = $75,000 current liabilities = $2,000 take-home pay = $2,300 gross income = $3,500 monthly expenses = $2,050 multiple choice 2.40% 3.06% 34.78% 33.79% 21.71%
Answers: 2
You know the right answer?
The Goodparts Company produces a component that is subsequently used in the aerospace industry. The...
Questions
question
Biology, 23.04.2020 18:25
question
Biology, 23.04.2020 18:25
question
Mathematics, 23.04.2020 18:25
question
Mathematics, 23.04.2020 18:25
question
Mathematics, 23.04.2020 18:25
question
Mathematics, 23.04.2020 18:25
Questions on the website: 13722362