subject
Business, 25.11.2021 14:10 jesicaagan

Indiana Electronics requires a 95% service level for its 686MX computer. Average delivery lead time for the item from the supplier is 4 days and average daily demand for the item is 5 units. This implies that: a. there is a 5% chance that demand will exceed supply during the lead time.
b. there is a 5% chance that safety stock will be used during the lead time.
c. 95% of all customer orders will be filled each year.
d. a quantity equal to 95% of demand during lead time should be on hand when a reorder is placed.
d. none of the above.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 06:40
At april 1, 2019, the food and drug administration is in the process of investigating allegations of false marketing claims by hulkly muscle supplements. the fda has not yet proposed a penalty assessment. hulkly’s fiscal year ends on december 31, 2018. the company’s financial statements are issued in april 2019. required: for each of the following scenarios, determine the appropriate way to report the situation. 1. management feels an assessment is reasonably possible, and if an assessment is made an unfavorable settlement of $13 million is reasonably possible. 2. management feels an assessment is reasonably possible, and if an assessment is made an unfavorable settlement of $13 million is probable. 3. management feels an assessment is probable, and if an assessment is made an unfavorable settlement of $13 million is reasonably possible. 4. management feels an assessment is probable, and if an assessment is made an unfavorable settlement of $13 million is probable.
Answers: 1
question
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
question
Business, 22.06.2019 20:30
Discuss ways that oracle could provide client customers with the ability to form better relationships with customers.
Answers: 3
question
Business, 22.06.2019 21:10
You are the manager of a large crude-oil refinery. as part of the refining process, a certain heat exchanger (operated at high temperatures and with abrasive material flowing through it) must be replaced every year. the replacement and downtime cost in the first year is $165 comma 000. this cost is expected to increase due to inflation at a rate of 7% per year for six years (i.e. until the eoy 7), at which time this particular heat exchanger will no longer be needed. if the company's cost of capital is 15% per year, how much could you afford to spend for a higher quality heat exchanger so that these annual replacement and downtime costs could be eliminated?
Answers: 1
You know the right answer?
Indiana Electronics requires a 95% service level for its 686MX computer. Average delivery lead time...
Questions
question
Biology, 21.10.2020 22:01
question
Mathematics, 21.10.2020 22:01
Questions on the website: 13722360