Chemistry, 10.10.2019 05:10 aboatright7410
In an attempt to conserve water and to be awarded leed (leadership in energy and environmental design) certification, a 20,000-liter cistern has been installed during construction of a new building. the cistern collects water from an hvac (heating, ventilation, and air-conditioning) system designed to provide 2830 cubic meters of air per minute at 22°c and 50% relative humidity after converting it from ambient conditions (31°c, 70% relative humidity). the collected condensate serves as the source of water for lawn maintenance. estimate (a) the rate of intake of air at ambient conditions in cubic feet per minute and (b) the hours of operation required to fill the cistern.
Answers: 2
Chemistry, 21.06.2019 21:30
An alcohol thermometer makes use of alcohol's changing in order to measure temperature. as the temperature goes up, the alcohol contained in the thermometer increases in volume, filling more of the thermometer's tube.
Answers: 3
Chemistry, 22.06.2019 03:00
Atrain travels 74 kilometers in 3 hours, and then 81 kilometers in 5 hours. what is its average speed?
Answers: 2
Chemistry, 22.06.2019 07:00
At 450 mm hg a gas has a volume of 760 l, what is its volume at standard pressure
Answers: 2
Chemistry, 22.06.2019 16:00
About 3% of the water on earth is freshest. only about 40% of that freshwater is available for human use. why is so much freshwater unavailable for human use?
Answers: 2
In an attempt to conserve water and to be awarded leed (leadership in energy and environmental desig...
Biology, 10.06.2021 15:30
History, 10.06.2021 15:30
Mathematics, 10.06.2021 15:30
Mathematics, 10.06.2021 15:30
Spanish, 10.06.2021 15:30
Mathematics, 10.06.2021 15:30
Mathematics, 10.06.2021 15:30
Advanced Placement (AP), 10.06.2021 15:30
Mathematics, 10.06.2021 15:30