subject

Asoftware company hired ray, a college graduate to work in their development team. ray is assigned to work in the coding phase of a project. what happens during the coding phase of a software development project? a. the customer receives a working model of the software. b. developers convert the program design into code. c. developers gather requirements directly from the stakeholders. d. testing teams check the product for quality.

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 03:30
Write a computer program to calculate the three-phase fault current for a fault at f in figure 1.16, with the network normal, and with one line at a time removedproblems 1.1 write a computer program to calculate the three-phase fault current for a fault at f in figure 1.16, with the network normal, and with one line at a time removed 20 power system relaying from service. the positive-sequence impedance data are given in the accompanying table. use the commonly made assumption that all prefault resistance values are (1.0+j0.0) pu, and neglect all resistance values. calculate the contribution to the fault flowing through the cb b and the voltage at that bus. for each calculated case, consider the two possibilities: cb b2 closed or open. the latter is known as the stub-end fault í• figure 1.16 problem 1.1 system data for figure 1.16 from to positive sequence 0.0+j0.1 0.05j0.15 0.04 j0.2 0.01 jo.i 0.015 + j0.15 0.01 j0.19 0.01 +j0.19 0.03+j0.1 0.0+j0.08 6 6 6 from service. the positive-sequence impedance data are given in the accompanying table. use the commonly made assumption that all prefault resistance values are (1.0 + j 0.0) pu, and neglect all resistance values. calculate the contribution to the fault flowing through the cb b1, and the voltage at that bus. for each calculated case, consider the two possibilities: cb b2 closed or open. the latter is known as the “stub-end” fault.
Answers: 2
question
Computers and Technology, 22.06.2019 17:00
Match the following. 1. show grouping of word processing tasks that can be performed quick access toolbar 2. shortcut location for commonly used elements scroll bars 3. organized commands used to modify documents ribbon 4. used to align and measure content in a word screen zoom bar 5. vertical and horizontal bars that are used to navigate through a document contextual tabs 6. displays the name of the document in use ruler 7. allows users to enlarge or shrink a visual of a word document title bar
Answers: 2
question
Computers and Technology, 23.06.2019 15:20
In a game with three frames, where will the objects on layer 1 appear? a. next to the play area b. in the middle of the game c. behind everything else d. in front of everything else
Answers: 1
question
Computers and Technology, 23.06.2019 20:30
What are some settings you can control when formatting columns?
Answers: 1
You know the right answer?
Asoftware company hired ray, a college graduate to work in their development team. ray is assigned t...
Questions
question
English, 29.04.2021 17:30
question
Biology, 29.04.2021 17:30
question
Mathematics, 29.04.2021 17:30
Questions on the website: 13722361