subject

Which of the following statements about sequence diagrams is wrong?
a. this is a request from the object sending the message to the object receiving the message. the request is for the receiver to carry out one of its (the receiver’s) operations. usually, this entails the sender waiting for the receiver to carry out that operation. because the sender waits for the receiver (that is, "synchs up" with the receiver), this
message is also referred to as synchronous..
b. uml signifies the synchronous message type with a filled
arrowhead at the end of a solid line.
c. another kind of message is asynchronous. with this one,
the sender transfers control to the receiver and doesn’t wait
for the operation to complete.
d. the symbol for the return message is an openstick
arrowhead with a solid line.

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 21.06.2019 18:00
Is the following sentence true or false? during meiosis, the two alleles for each gene stay together.
Answers: 3
question
Computers and Technology, 22.06.2019 05:00
Lisa has a section of her document that she would like to include in the index. which option should lisa choose? mark index mark entry insert endnote add text
Answers: 3
question
Computers and Technology, 22.06.2019 23:30
For her science class, elaine is creating a presentation on weather in the united states. she wants to make the presentation beautiful and interesting by drawing simple cloud or wave shapes. which is the best way for elaine to draw these shapes?
Answers: 1
question
Computers and Technology, 23.06.2019 03:10
Acomputer has a two-level cache. suppose that 60% of the memory references hit on the first level cache, 35% hit on the second level, and 5% miss. the access times are 5 nsec, 15 nsec, and 60 nsec, respectively, where the times for the level 2 cache and memory start counting at the moment it is known that they are needed (e.g., a level 2 cache access does not even start until the level 1 cache miss occurs). what is the average access time?
Answers: 1
You know the right answer?
Which of the following statements about sequence diagrams is wrong?
a. this is a request from...
Questions
question
Mathematics, 24.09.2021 02:30
question
Spanish, 24.09.2021 02:30
question
Mathematics, 24.09.2021 02:40
Questions on the website: 13722360