Computers and Technology, 09.12.2019 18:31 sophiaa23
We have a program core consisting of five conditional branches. the program core will be executed thousands of times. below are the outcomes of each branch for one execution of the program core (t for taken, n for not taken) branch 1: t-t-t branch 2: n-n-n-n branch 3: t-n-t-n-t-n branch 4: t-t-t-n-t branch 5: t-t-n-t-t-n-t assume the behavior of each branch remains the same for each program core execution. for dynamic schemes, assume each branch has its own prediction buffer and each buffer is initialized to the same state before each execution. list the predictions for the following branch prediction schemes: a. always taken b. always not takern c. 1-bit predictor, initialized to predict taken d. 2-bit predictor, initialized to weakly predict taken what are the prediction accuracies?
Answers: 1
Computers and Technology, 22.06.2019 15:30
Which of the following examples has four beats in each measure?
Answers: 2
Computers and Technology, 22.06.2019 17:00
Which of the following is not contained on the slide show toolbar? a. next button b. slide button c. close button d. pen too
Answers: 2
Computers and Technology, 23.06.2019 09:10
Effective character encoding requires standardized code. compatible browsers. common languages. identical operating systems.
Answers: 1
We have a program core consisting of five conditional branches. the program core will be executed th...
Mathematics, 20.10.2020 01:01
Engineering, 20.10.2020 01:01
Physics, 20.10.2020 01:01
Biology, 20.10.2020 01:01
Computers and Technology, 20.10.2020 01:01
Mathematics, 20.10.2020 01:01
English, 20.10.2020 01:01
Spanish, 20.10.2020 01:01