A copy machine is available 24 hours a day. On a typical day, the machine produces 100 jobs. Each job takes about 3 minutes on the machine, 2 minutes of which is processing time and 1 minute is setup time (logging in, defining the job). About 20 percent of the jobs need to be reworked, in which case the setup time and the processing time have to be repeated. The remainder of the time, the equipment is idle. What is the OEE of the equipment?

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 24.06.2019 08:30
Formatting rows and columns is similar to cell formatting. in an openoffice calc spreadsheet, you can format data entered into rows and columns with the of the rows and columns options. you can insert rows and columns into, or delete rows and columns from, a spreadsheet. use the insert or delete rows and columns option on the insert tab. alternatively, select the row or column where you want new rows or columns to appear, right-click, and select insert only row or only column options. you can hide or show rows and columns in a spreadsheet. use the hide or show option on the format tab. for example, to hide a row, first select the row, then choose the insert tab, then select the row option, and then select hide. alternatively, you can select the row or columns, right-click, and select the hide or show option. you can adjust the height of rows and width of columns. select row and then select the height option on the format tab. similarly, select column, then select the width option on the format tab. alternatively, you can hold the mouse on the row and column divider, and drag the double arrow to the position. you can also use the autofit option on the table tab to resize rows and columns.
Answers: 1
question
Computers and Technology, 25.06.2019 01:00
What phrase indicates someone has knowledge and understanding of computer,internet,mobile devices and related technologies?
Answers: 1
question
Computers and Technology, 25.06.2019 08:00
What are good colleges to apply to if you got like a 2.5 as a gpa? already got a call back from gcu at least its a start rt
Answers: 2
question
Computers and Technology, 25.06.2019 08:10
Why should the technician watch for signs of contamination in the oil when recovering refrigerant from a system
Answers: 3
You know the right answer?