subject

WHAT is the USE OF RIBBON TAB

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 01:40
Writing a modular program in visual c++. i am new to this and not sure what i am missing. i am getting the following error: baddate.cpp: in function β€˜int main()’: baddate.cpp: 50: 3: error: β€˜else’ without a previous β€˜if’elsehere are the instructions and code: writing a modular program in c++in this lab, you add the input and output statements to a partially completed c++ program. when completed, the user should be able to enter a year, a month, and a day. the program then determines if the date is valid. valid years are those that are greater than 0, valid months include the values 1 through 12, and valid days include the values 1 through 31.notice that variables have been declared for you.write the simulated housekeeping() function that contains the prompts and input statements to retrieve a year, a month, and a day from the user.include the output statements in the simulated endofjob() function. the format of the output is as follows: month/day/year is a valid date.ormonth/day/year is an invalid date.execute the program entering the following date: month = 5, day = 32, year = 2014. record the output of this program.execute the program entering the following date: month = 9, day = 21, year = 2002. record the output of this /* program name: baddate.cppfunction: this program determines if a date entered by the user is valid.input: interactiveoutput: valid date is printed or user is alerted that an invalid date was entered*/#include bool validatedate(int, int, int); using namespace std; int main(){// declare variablesint year; int month; int day; const int min_year = 0, min_month = 1, max_month = 12, min_day = 1, max_day = 31; bool validdate = true; // this is the work of the housekeeping() method// get the year, then the month, then the daycout< < "enter the year"< > year; cout< < "enter the month"< > month; cout< < "enter the day"< > day; // this is the work of the detailloop() method// check to be sure date is validif(year < = min_year) // invalid yearvaliddate = false; else if (month < min_month || month > max_month) // invalid monthvaliddate = false; else if (day < min_day || day > max_day) // invalid dayvaliddate = false; // this is the work of the endofjob() method// test to see if date is valid and output date and whether it is valid or notif(validdate == true); {// output statementcout<
Answers: 1
question
Computers and Technology, 23.06.2019 02:00
What is the main benefit of minimizing the ribbon in word? more options will be accessible through customized keystrokes. more of the document will be viewable without needing to scroll. fewer controls will be accessible to the user by using the mouse. fewer editing options will be available without entering a password.
Answers: 1
question
Computers and Technology, 23.06.2019 09:30
Given a link with a maximum transmission rate of 32.8 mbps. only two computers, x and y, wish to transmit starting at time t = 0 seconds. computer x sends filex (4 mib) and computer y sends filey (244 kib), both starting at time t = 0. statistical multiplexing is used, with details as follows packet payload size = 1000 bytes packet header size = 24 bytes (overhead) ignore processing and queueing delays assume partial packets (packets consisting of less than 1000 bytes of data) are padded so that they are the same size as full packets. assume continuous alternating-packet transmission. computer x gets the transmission medium first. at what time (t = ? ) would filey finish transmitting? give answer in milliseconds, without units, and round to one decimal places (e.g. for an answer of 0.013777 seconds you would enter "13.8" without the quotes)
Answers: 3
question
Computers and Technology, 23.06.2019 12:30
How is the brightness of oled of the diaplay is controled
Answers: 1
You know the right answer?
WHAT is the USE OF RIBBON TAB...
Questions
Questions on the website: 13722363