subject

Consider QuickSort on the array A[1:n] and assume that the pivot element x (used to split the array A[lo:hi] into two portions such that all elements in the left portion A[lo:m] are â¤x and all elements in the right portion A[m:hi] are â¥x) is the last element of the array to be split (i. e., A[hi]). Construct an infinite sequence of numbers for n and construct an assignment of the numbers 1...n to the n array elements that causes QuickSort, with the stated choice of pivot, to a. execute optimally (that is A[lo:m] and A[m:hi] are always of equal size)
b. execute in the slowest possible way.

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 05:20
Write a program called assignment3 (saved in a file assignment3.java) that computes the greatest common divisor of two given integers. one of the oldest numerical algorithms was described by the greek mathematician, euclid, in 300 b.c. it is a simple but very e↵ective algorithm that computes the greatest common divisor of two given integers. for instance, given integers 24 and 18, the greatest common divisor is 6, because 6 is the largest integer that divides evenly into both 24 and 18. we will denote the greatest common divisor of x and y as gcd(x, y). the algorithm is based on the clever idea that the gcd(x, y) = gcd(x ! y, y) if x > = y and gcd(x, y) = gcd(x, y ! x) if x < y. the algorithm consists of a series of steps (loop iterations) where the “larger” integer is replaced by the di↵erence of the larger and smaller integer. this continues until the two values are equal. that is then the gcd.
Answers: 3
question
Computers and Technology, 22.06.2019 19:30
When creating a presentation in libre office impress, where does the editing of slides take place? a. the slides panel b. the center panel c. the tasks panel, under the masters pages tab d. the tasks panel, under the layouts tab
Answers: 1
question
Computers and Technology, 22.06.2019 20:30
In this lab, you complete a prewritten c program that calculates an employee’s productivity bonus and prints the employee’s name and bonus. bonuses are calculated based on an employee’s productivity score as shown below. a productivity score is calculated by first dividing an employee’s transactions dollar value by the number of transactions and then dividing the result by the number of shifts worked.
Answers: 3
question
Computers and Technology, 23.06.2019 12:00
What type of slide show is a dynamic and eye-catching way to familiarize potential customers with what your company has to offer? a. ole b. photo album c. brochure d. office clipboard
Answers: 2
You know the right answer?
Consider QuickSort on the array A[1:n] and assume that the pivot element x (used to split the array...
Questions
question
Arts, 15.01.2021 23:10
question
Mathematics, 15.01.2021 23:10
question
Biology, 15.01.2021 23:10
question
Mathematics, 15.01.2021 23:10
question
History, 15.01.2021 23:10
question
History, 15.01.2021 23:10
Questions on the website: 13722367