subject
Computers and Technology, 27.07.2021 01:40 krob95

In the welding operations of a bicycle manufacturer, a bike frame has a long flow time. The set up for the bike frame is a 7 hour long operation. After the setup, the processing takes 6 hour(s). Finally, the bike frame waits in a storage space for 7 hours before sold. Determine the value-added percentage of the flow time for this bike frame. Round your answer to the nearest whole number for percentage and do NOT include the "%" sign in the answer. For example, if your answer is 17.7%, please answer 18. If your answer is 17.4%, please answer 17. No "%" sign. No letter. No symbols. No explanation. Just an integer number.

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 04:50
Which are steps taken to diagnose a computer problem? a) reproducing the problem and using error codes b) reproducing the problem and troubleshooting c) using error codes and troubleshooting d) using error codes and stepping functions
Answers: 1
question
Computers and Technology, 22.06.2019 15:00
Which of the following has not been attributed at least in part to social media a. drug addiction b. depression c. kidnapping d. murder
Answers: 2
question
Computers and Technology, 23.06.2019 12:00
3. when you right-click a linked spreadsheet object, what commands do you choose to activate the excel features? a. linked worksheet object > edit b. edit data > edit data c. linked spreadsheet > edit d. object > edit data
Answers: 2
question
Computers and Technology, 23.06.2019 23:40
Which of the following calculates the total from the adjacent cell through the first nonnumeric cell by default, using the sum function in its formula? -average -autosum -counta -max
Answers: 1
You know the right answer?
In the welding operations of a bicycle manufacturer, a bike frame has a long flow time. The set up f...
Questions
question
Mathematics, 17.07.2019 12:30
question
Computers and Technology, 17.07.2019 12:30
Questions on the website: 13722362