subject
Engineering, 11.07.2019 00:40 kwhitt

Acardboard box supplier must deliver 3,000 size large boxes per week to keep its largest customer happy. the process for manufacturing the box is a four-step serial process and because they use recycled material, material quality is sometimes compromised resulting in scrap at each step. the scrap (defect) rates for the four respective steps are as follows: d1=0.07, d2=0.04, d3=0.05, and d4=0.02. how many boxes need to be started each month to meet the desired demand.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
You know the right answer?
Acardboard box supplier must deliver 3,000 size large boxes per week to keep its largest customer ha...
Questions
question
Mathematics, 28.09.2021 01:50
Questions on the website: 13722363