subject
Engineering, 11.07.2019 02:20 dustinquiz255

Asquare duct with a 10pa/m pressure drop, .001 pa-s viscosity, and a duct side of .1m with a length of 1m is compared to a circular pipe. compute a)-wall shear stress of each and plot this b)-max velocities of each c)-volume flow rates for each

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:10
Aplate of dimensions 3 m x 3 m is placed 0.37 mm apart from a fixed plate. the plate requires a force of 2n to move at speed of 45 cm/s. evaluate the viscosity of the fluid in between the plates
Answers: 3
You know the right answer?
Asquare duct with a 10pa/m pressure drop, .001 pa-s viscosity, and a duct side of .1m with a length...
Questions
question
Mathematics, 23.09.2020 16:01
question
History, 23.09.2020 16:01
question
Chemistry, 23.09.2020 16:01
question
Mathematics, 23.09.2020 16:01
Questions on the website: 13722363