subject
Engineering, 16.01.2020 23:31 jackfrost5

Ahydrocarbon gas processing vessel is depressurised through a blowdown valve to the flare system. describe the purpose of a blowdown system. if there was a power system failure on a process plant, what would be the failsafe position for a blowdown valve?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
You know the right answer?
Ahydrocarbon gas processing vessel is depressurised through a blowdown valve to the flare system. de...
Questions
question
English, 11.02.2021 23:50
question
Mathematics, 11.02.2021 23:50
question
Mathematics, 11.02.2021 23:50
question
Mathematics, 11.02.2021 23:50
Questions on the website: 13722367