Calculate the operational availability for a power generator with 1 scheduled maintenance per 1000 hours of operation and failure rate of 0.6 failures per 1000 hours. preventive maintenance takes on average 8 hours, however if the engine fails, it typically takes 26 hours to repair it. logistics and administrative delays typically add extra 12 hours to the maintenance time.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
question
Engineering, 04.07.2019 19:10
An engine, weighing 3000 n, is supported on a pedestal mount. it has been observed that the engine induces vibration into the surrounding area through its pedestal at the maximum operating speed. determine the stiffness of the dynamic vibration absorber spring in (n/m) that will reduce the vibration when mounted on the pedestal. the magnitude of the exciting force is 250 n, and the amplitude of motion of the auxiliary mass is to be limited to 2 mm note: in this question type-in right numbers, no decimals, no fractions, no unit. approximate to right number if needed
Answers: 3
You know the right answer?
Calculate the operational availability for a power generator with 1 scheduled maintenance per 1000 h...
Questions
question
Chemistry, 25.09.2020 18:01
question
Mathematics, 25.09.2020 18:01
question
Biology, 25.09.2020 18:01
question
Mathematics, 25.09.2020 18:01
Questions on the website: 13722361