Engineering, 21.08.2019 05:30 toniawu18

Acooling tower for an engineering process takes in air at 20 °c dry bulb with a relative humidity of 70% and discharges air at 29 °c dry bulb with a relative humidity of 95%. the air flow is recorded to be 400 m per hour at the inlet point. what is the quantity of heat energy being produced by the process and how much will it cost in top-up water alone, for an 8 hour shift, if the top-up water costs €0.20/litre. you may assume the air and humidity values are consistent during the complete 8hr shift.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:20
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
You know the right answer?
Acooling tower for an engineering process takes in air at 20 °c dry bulb with a relative humidity of...
Questions
question
Social Studies, 26.11.2020 21:30
question
Social Studies, 26.11.2020 21:30
question
Spanish, 26.11.2020 21:30
question
History, 26.11.2020 21:30
Questions on the website: 13722367