It will be necessary to fill a 300,000 yd3 depression, and the fill material must be compacted to 95% of the standard proctor (maximum) density. a 10% final moisture content is desired in either case. the unit weight of water is 62.4 lbf/ft3. (a). what would be the excavated volume of borrow from site a in place? (b). what would be the volume of borrow from site b in transport? (c). what soil would be cheaper to use? what’s the cost for the cheaper soil? (d). what is unit weight in transport from borrow site b?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
question
Engineering, 04.07.2019 19:10
Abarometer contains mercury with a density of 13600 kg/m3. atmospheric conditions are 95.8 kpa and 20 °c at 20 °c, the vapor pressure of the mercury is 0.000173 kpa. the column of mercury will rise to a height of most nearly. select one: a)- 0.38 m b)- 0.82 m c)- 0.48 m d)- 0.72 m
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
It will be necessary to fill a 300,000 yd3 depression, and the fill material must be compacted to 95...
Questions
question
History, 05.11.2020 05:50
question
Mathematics, 05.11.2020 05:50
question
Spanish, 05.11.2020 06:00
question
History, 05.11.2020 06:00
question
Mathematics, 05.11.2020 06:00
question
History, 05.11.2020 06:00
question
Mathematics, 05.11.2020 06:00
Questions on the website: 13722361