Awire has been installed without proper strain relief. the 10-gauge, insulated, solid copper, electrical wire has been supporting a direct tensile load of about 50 pounds for several weeks. strain relief has been added to remove the load; however, your coworker needs to know if the wire needs to be replaced immediately. should the wire be replaced? show the support of your answer.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 19:20
Apiping systems consists of 6 m of 6-std type k and 12 m of 4-std type k, both drawn copper tubing. the system conveys ethylene glycol at a rate of 0.013 m3/s. the pressure drop across the system is to be calculated. there are two 90Β° elbows in the 6-in pipe, a reduction from the 6-in pipe to the 4-in pipe and four 90Β° elbows in the 4-in pipe. all fittings are soldered (same as flanged) and regular. the inlet and outlet of the system are at the same height.
Answers: 1
question
Engineering, 06.07.2019 03:10
Two slings are used to lift a girder of length l and uniform weight per unit length. what is the best position for the slings if the bending moment due to the weight of the girder is to be kept to a minimum?
Answers: 2
You know the right answer?
Awire has been installed without proper strain relief. the 10-gauge, insulated, solid copper, electr...
Questions
question
Mathematics, 22.12.2020 19:20
Questions on the website: 13722367