Aproduct whose total work content time = 50 min is assembled on a manual production line at a rate of 24 units per hour. from previous experience with similar products, it is estimated that the manning level will be close to 1.5, uptime proportion will be 0.95, and line balancing efficiency will be 0.94. if 9 sec are lost from the cycle time for repositioning, determine (a) cycle time, (b) numbers of workers and (c) stations on the line.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 19:10
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
question
Engineering, 04.07.2019 19:10
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
You know the right answer?
Aproduct whose total work content time = 50 min is assembled on a manual production line at a rate o...
Questions
question
Mathematics, 16.10.2019 13:30
question
Mathematics, 16.10.2019 13:30
Questions on the website: 13722362