Engineering, 06.10.2019 18:00 aronrobinson4

Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at minimum cost. solve using graphical method. a construction site has machines that simultaneously excavate and grade
machine a grades:
ga = 18.9 unit h-1
and excavates:
ea = 17.4 unit h-1
the cost to operate machine a is:
ca = 109 $ h-1
machine b grades:
gb = 8.41 unit h-1
and excavates:
eb = 23.9 unit h-1
the cost to operate machine b is:
cb = 109 $ h-1
each machine can be assigned to the cul-de-sac for no more than 10 hours.
amount of grading:
g = 100 unit
amount of excavating:
e = 150 unit
"units" here are a measure of volume.
what are the optimal number of hours to operate machine a? what are the optimal number of hours to operate machine b? what is the minimum cost to complete the excavation and grading?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
You know the right answer?
Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at...
Questions
question
English, 30.11.2020 20:20
question
Physics, 30.11.2020 20:20
question
English, 30.11.2020 20:20
Questions on the website: 13722363