subject
Engineering, 26.10.2019 00:43 sawyerfauver

In the abc machine shop, workers punch in at 8: 00 am and punch out at 4: 30 pm. the labor-management agreement allows 30 min for lunch, which is not counted as part of the 8-hour shift. in determining the allowance for computing time standards, two 15 min breaks are provided (personal time and fatigue), one in the morning and one in the afternoon; and 20 min have been negotiated as lost time due to supervisor interruptions and equipment malfunctions. what pfd allowance factor should be added to the normalized time to account for these losses in the computation of a standard time, so that if the worker works at standard performance, she will produce exactly eight standard hours?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
In the abc machine shop, workers punch in at 8: 00 am and punch out at 4: 30 pm. the labor-managemen...
Questions
question
Mathematics, 02.02.2020 06:45
Questions on the website: 13722359