subject
Engineering, 29.10.2019 02:31 jmeza502506

Compute the average hourly cost of a carpenter to a contractor. assume the work is in a subsistence area and the daily subsistence rate is $19.50. the carpenter works the second shift on a two-shift project where a project labor contract establishes a "work 7 pay 8 hour" pay basis for straight time. he works 6 days, 10 hours a day. in addition to time and a half for overtime monday through friday, the contract calls for double time for all work on weekends

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
question
Engineering, 04.07.2019 19:10
Asteel wire of 2 mm diameter is fixed between two points located 2 m apart. the tensile force in the wire is 250n, if its density of steel is given by 7830 kg/m3 the fundamental frequency of vibration hz? ?
Answers: 3
question
Engineering, 04.07.2019 19:10
Aplate of dimensions 3 m x 3 m is placed 0.37 mm apart from a fixed plate. the plate requires a force of 2n to move at speed of 45 cm/s. evaluate the viscosity of the fluid in between the plates
Answers: 3
You know the right answer?
Compute the average hourly cost of a carpenter to a contractor. assume the work is in a subsistence...
Questions
question
Mathematics, 13.11.2020 23:20
question
Social Studies, 13.11.2020 23:20
question
Chemistry, 13.11.2020 23:20
question
Mathematics, 13.11.2020 23:20
question
Physics, 13.11.2020 23:20
question
Social Studies, 13.11.2020 23:20
question
Mathematics, 13.11.2020 23:20
Questions on the website: 13722361