problem 1: schedule based on lot for lot and give the costs.
hedule
- in wet
2 we...
Engineering, 29.10.2019 09:31 sarahsteelman
problem 1: schedule based on lot for lot and give the costs.
hedule
- in wet
2 weei
lead time =
setup cost =
holding cost=
stockout cost=
2 weeks
300 $
15 $ per week per unit
30 $/week
setup cost=
holding cost
stockout cost =
total=
1
10
16
2
15
7
3
20
4
25
5
10
6
200
8
25
9
15
period:
gross requirement
on hand begin of period
on hand end of period
net requirement
planned order receipt
planned order release
stockout
Answers: 3
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
Biology, 21.07.2019 02:30
Social Studies, 21.07.2019 02:30
Geography, 21.07.2019 02:30
Mathematics, 21.07.2019 02:30