subject
Engineering, 30.10.2019 05:31 joynerjaila

An air-standard dual cycle has a compression ratio of 9.1 and displacement of vd = 2.2 l. at the beginning of compression, p1 = 95 kpa, and t1 = 290 k. the heat addition is 5 kj, with one quarter added at constant volume and the rest added at constant pressure.

determine:

a) each of the unknown temperatures at the various states, in k.
b) the net work of the cycle, in kj.
c) the power developed at 3000 cycles per minute, in kw.
d) the thermal efficiency. e) the mean effective pressure, in kpa.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
question
Engineering, 04.07.2019 19:20
To design a steam turbine to produce 12,000 hp power. a engineer comsiders using a steady state stean low st 1160fr and engineer considers using a steady state steam flow at 1160°r and 450 psia to drive this steam turbine. the exhaust of the steam is cooled by the lake (vacuum). heat losing to the surroundings is measured at a rate of 555.55 btu/s. (a) sketch the system with the given conditions. (b) neglecting kinetic and potential energy changes from inlet to exit, determine the volumetric flow rate of the steam at the inlet, (ft'/hr). must clearly show unit conversions at crtical terms.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 02:30
In a unit cell of fcc structure, indicate the position of one of the tetrahedral interstitial sites by plotting the corresponding tetrahedron. do the same for one of the octahedral interstitial sites (in a separate fcc unit cell). mark the positions of all the tetrahedral and octahedral interstitial sites in the unit cells. how many equivalent tetrahedral sites and how many equivalent octahedral sites are contained in a fcc unit cell, respectively. what is the coordination number for a tetrahedral site and what is the coordination number for an octahedral site?
Answers: 2
You know the right answer?
An air-standard dual cycle has a compression ratio of 9.1 and displacement of vd = 2.2 l. at the beg...
Questions
question
Chemistry, 20.10.2020 16:01
question
Advanced Placement (AP), 20.10.2020 16:01
question
Mathematics, 20.10.2020 16:01
Questions on the website: 13722363