subject
Engineering, 06.11.2019 04:31 mgkman9814

Standards for firewalls may be based on their thermal response to a prescribed radiant heat flux. consider a 0.25-m-thick concrete wall (rho= 2300 kg/m3, c= 880 j/kg·k, k= 1.4 w/m·k), which is at an initial temperature of ti= 25°c and irradiated at one surface by lamps that provide a uniform heat flux of qs′′= 0.85·104 w/m2. the absorptivity of the surface to the irradiation is αs= 1.0. if building code requirements dictate that the temperatures of the irradiated and back surfaces must not exceed 325°c and 25°c, respectively, after 30 min of heating, will the requirements b

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Standards for firewalls may be based on their thermal response to a prescribed radiant heat flux. co...
Questions
question
Mathematics, 14.04.2021 17:10
question
Mathematics, 14.04.2021 17:10
question
Mathematics, 14.04.2021 17:20
question
Mathematics, 14.04.2021 17:20
Questions on the website: 13722367