subject
Engineering, 19.11.2019 01:31 aliceohern

Critical thinking questionscase 7-2tom started the process of selecting a new system for the firm and he is weighing all of the various issues that need to be considered and the resources he has at his disposal as he makes this important decision. as tom prepares to remove the field in his selection of a new system, he wants a quick refresher on the difference between a request for proposal (rfp) and a request for quotation (rfq). if he needs a request for proposal (rfp), simone will write it, and if he needs an rfq, marny is responsible for writing that. which of the following is trueo a. when mary is tasked with the job, her output can involve outright purchase or a variety of leasing options. o b. rfps and rfqs have very different objectives. c. an rfp that simone writes is more specific than an rfq marny will write. d. when simone is tasked with the job, tom already knows the specific product or service he wants and he needs to obtain price quotations or bids.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
You know the right answer?
Critical thinking questionscase 7-2tom started the process of selecting a new system for the firm an...
Questions
Questions on the website: 13722363