Engineering, 19.11.2019 07:31 Yung5hagger

Suppose we have n jobs labelled 1; : : : ; n. for each job, you have determined the bonus of completing the job, vi 0, a penalty per day that you accumulate for not doing the job, pi 0, and the days required for you to successfully complete the job ri > 0. every day, we choose one unfinished job to work on. a job i has been finished if we have spent ri days working on it. this doesn’t necessarily mean you have to spend ri contiguous sequence of days working on job i. we start on day 1, and we want to complete all our jobs and finish with maximum reward. if we finish job i at the end of day t, we will get reward pi. note, this value can be negative if you choose to delay a job for too long. given this information, what is the optimal job scheduling policy to complete all of the jobs? provide reasons for it’s optimality.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
You know the right answer?
Suppose we have n jobs labelled 1; : : : ; n. for each job, you have determined the bonus of com...
Questions
question
History, 03.12.2020 02:10
question
Mathematics, 03.12.2020 02:10
question
Mathematics, 03.12.2020 02:10
question
Mathematics, 03.12.2020 02:20
Questions on the website: 13722360