On average 16 new batches of parts are started through a certain plant each week. average batch quantity is 50 parts that are processed through a sequence of seven machines. setup time per machine per batch averages 4 hours, and average operation time per machine for each part is 12 min. nonoperation time per batch at each machine averages 8 hours. there are 37 machines in the factory. any machine can be set up for any type of batch processed in the plant. the plant operates 40 hours per week. the plant manager complains that almost 65 hours of overtime must be authorized each week to keep up with the production schedule. determine
(a) manufacturing lead time for an average order,
(b) weekly production capacity of the plant if all machines were operated at 100% utilization,
(c) current utilization of the plant, and
(d) average work-in-process (number of parts) in the plant.
(e) why must overtime be authorized to achieve the desired output?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
question
Engineering, 04.07.2019 18:20
Find the kinematic pressure of 160kpa. for air, r-287 j/ kg k. and hair al viscosity of air at a temperature of 50°c and an absolute (10 points) (b) find the dynamic viscosity of air at 110 °c. sutherland constant for air is 111k
Answers: 3
question
Engineering, 04.07.2019 19:10
With increases in magnification, which of the following occur? a. the field of view decreases. b. the ambient illumination decreases. c. the larger parts can be measured. d. the eyepiece must be raised.
Answers: 1
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2
You know the right answer?
On average 16 new batches of parts are started through a certain plant each week. average batch quan...
Questions
question
Mathematics, 02.07.2020 14:01
question
Mathematics, 02.07.2020 14:01
question
Mathematics, 02.07.2020 14:01
question
Mathematics, 02.07.2020 14:01
Questions on the website: 13722361