An intersection approach has a saturation flow rate of 1500 veh/h, and vehicle arrive at this approach at the rate of 800 veh/h. the approach is controlled by a pre-timed signal with a cycle length of 60 seconds and d/d/1 queuing holds. local standards require that signals should be set such that all approach queues dissipate 10 seconds before the end of the effective green portion of the cycle. assuming that approach capacity exceeds arrivals, determine the maximum length of effective red that will satisfy the local standards

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
question
Engineering, 04.07.2019 19:20
The power source in a certain welding setup generates 3500w that is transferred to the low carbon steel work with a heat transfer factor of 0.85. the melting factor in the operation is 0.45. a continuous fillet weld is to be made with a cross-sectional area of 23 mm2 determine the travel speed at which the welding can be accomplished.
Answers: 3
You know the right answer?
An intersection approach has a saturation flow rate of 1500 veh/h, and vehicle arrive at this approa...
Questions
question
Mathematics, 04.09.2019 05:30
question
Mathematics, 04.09.2019 05:30
Questions on the website: 13722362