subject
Engineering, 26.11.2019 02:31 russbeast6584

Floating point rounding error is: question 24 options: 1) a rare occurrence in modern computers2) a matter of academic interest only, with no practical consequences3) inevitable given the finite length of the binary floating point representation4) a problem when using the c float type, but not a problem when using the c double type

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i.e., a violation of one statement leads to the violatio the other statement)
Answers: 2
question
Engineering, 04.07.2019 19:20
To design a steam turbine to produce 12,000 hp power. a engineer comsiders using a steady state stean low st 1160fr and engineer considers using a steady state steam flow at 1160Β°r and 450 psia to drive this steam turbine. the exhaust of the steam is cooled by the lake (vacuum). heat losing to the surroundings is measured at a rate of 555.55 btu/s. (a) sketch the system with the given conditions. (b) neglecting kinetic and potential energy changes from inlet to exit, determine the volumetric flow rate of the steam at the inlet, (ft'/hr). must clearly show unit conversions at crtical terms.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 03:10
List and describe in sequence the operation process steps for boxf machine?
Answers: 1
You know the right answer?
Floating point rounding error is: question 24 options: 1) a rare occurrence in modern computers2) a...
Questions
question
Mathematics, 25.02.2022 08:10
Questions on the website: 13722367